The boom locking mechanism and the main Elevator Pistons are installed during Stage 62!
Monthly Archives: February 2023
Stage 61
Stage 60
The Left-hand Bed Section of the ladder boom is prepped as we complete Stage 60!
Stage 59
With Stage 59, we are in for a lot. While we assemble the Boom Support section, we also attach the Body to the Chassis!
Stage 58
Pack 9 starts right off with the construction of the turntable Storage Unit in Stage 58!